It's amazing how much can get done while waiting for the washer repair dude and being home with a sick kid (Monkey2) a few days ago. I didn't quite finish Monkey1's Cabo Hoodie by the end of the month, but I got close. All I need now is to do the hood and seam the pocket sides. I'm shooting to finish by the weekend hopefully as the weather's gotten back to the fog again.

Monkey1 even got me to put beads on her sweater cuff. She was very precise on the number of beads and color too. As tapmouse knows, I can be somewhat anti-bead-ish, but Monkey1 knows how to get me to do things I don't like...sometimes.

I would've been done with the hoodie by now 'cept all that St st would make me want to do other things too. Surprisingly though, I wasn't in the mood for more socks despite finishing the Giotto with the Flow pair. Oh, I started my STR Lenore sock, but my STR production rate has been surprisingly slow. I think tapmouse picked up my STR mojo 'cause she's already turned the heel on her first Lenore.

Instead I was in the mood to wind up my Yarn Botanika 100% cashmere DK in Pink Sand and knitted up a few rows of the Lacy Zig Zag scarf pattern available on One Planet. Not that I've gotten very far with that either 'cause I ended up casting on for Fetching too in a brown Cash Vero I got from Purlescence awhile ago. (No pic of that yet as I'm deciding if I'm too tight on size 6 needles and need to frog & restart on size 7's or if I'm good and simply need to add length.)